Work Scope Template |
Pages |
Forms |
Images |
SUBCONTRACTOR SCOPE OF WORK |
9 |
1 |
0 |
SUPLIER/VENDOR SITE DELIVERY SCOPE OF WORK |
5 |
1 |
0 |
SUPPLIER/VENDOR Supply & Install SCOPE OF WORK |
8 |
1 |
0 |
Brick & Stone Work Specifications |
4 |
1 |
0 |
Kitchen and Bath Cabinet Order & Delivery Specifications |
5 |
1 |
0 |
Carpet Tradesman Installation Specifications |
5 |
1 |
0 |
Carpet Vender Specifications |
4 |
1 |
0 |
Ceramic Tile Installation – Tradesman Job Specifications |
6 |
1 |
2 |
Ceramic Tile Selection & Installation Specifications |
5 |
1 |
2 |
Cleaning Specifications |
4 |
1 |
0 |
Countertop – Granite, Solid Surface Specifications |
4 |
1 |
0 |
Countertop – Laminate Specifications |
3 |
1 |
0 |
Countertop – Laminate Specifications – Selections by BUILDER |
3 |
1 |
0 |
Deck Labor Specifications |
4 |
1 |
0 |
Driveway – Asphalt, Concrete, Paver Specifications |
4 |
1 |
0 |
Electrical Specifications |
6 |
1 |
0 |
Flatwork Pour and Prep Specifications |
7 |
1 |
3 |
Footing and Block Foundation Specifications |
8 |
1 |
3 |
Footing and Poured Foundation Specifications |
7 |
1 |
2 |
Framing Labor Specifications |
21 |
3 |
18 |
Garage Door Installation Specifications |
4 |
1 |
1 |
Gutter Installation |
2 |
1 |
0 |
Hardwood Flooring Installation & Finish Specifications |
7 |
1 |
1 |
Hardwood Flooring (unfinished) Order & Delivery Specifications |
4 |
1 |
0 |
Heating and Air-conditioning Specifications – forced air system |
9 |
1 |
2 |
Insulation (w/Air seal, Fire stop) |
6 |
1 |
4 |
Drywall Installation & Finish Contractor Specs |
7 |
1 |
7 |
Drywall Finish Tradesman Specs |
6 |
1 |
7 |
Landscaping Specifications |
8 |
1 |
0 |
Manufactured Fireplace Supply & Installation Specifications |
3 |
1 |
0 |
Media Wiring Specifications |
3 |
1 |
0 |
Mirrors,Glass, Shower Enclosure Specifications |
3 |
1 |
0 |
Painting & Staining Specifications |
10 |
1 |
1 |
Plumbing Vendor Specifications |
11 |
1 |
3 |
Plumbing Tradesman Specifications |
12 |
1 |
3 |
Roof Installation Specifications |
8 |
1 |
3 |
Roof Material Order & Delivery Specifications |
4 |
1 |
0 |
Septic System specs |
1 |
0 |
0 |
Shelving – Closet-Maid® – Material & Installation |
3 |
1 |
0 |
Siding Installation Specifications |
14 |
1 |
16 |
Siding Order & Delivery Specifications |
4 |
1 |
0 |
Siding Trim Order & Delivery Specifications |
4 |
1 |
0 |
Site Work Specifications |
19 |
3 |
6 |
Trim Labor Specifications |
8 |
1 |
0 |
Trim Material Order & Delivery Specifications |
5 |
1 |
0 |
Underlayment & Vinyl Tradesman’s Installation Specifications |
6 |
1 |
0 |
Underlayment & Vinyl Selections and Installation Specifications |
4 |
1 |
0 |
Waterproofing Specifications |
2 |
1 |
0 |
Water Well Specifications |
1 |
0 |
0 |
Total |
300 |
51 |
84 |